Construction Dewatering Pumps
Keep excavations dry and on schedule
Designed by Guzu
Tested before shipping
18-month warranty
The Challenge
Wet Sites Fall Behind
Groundwater and rain fill excavations faster than crews can dig. Wet sites stall foundations, risk wall collapse and push projects behind schedule.
How Guzu Helps
Clear Excavations, Trenches and Basements
So work stays on schedule.
01
On Site in Minutes
Trailer-mounted and road-towable.
02
Handles Mud and Debris
Open impellers that don't clog.
03
Quiet Options
Canopy sets for urban and night work.
04
Wellpoint Ready
Vacuum assisted sets for wellpoint systems.
Recommended Pumps
Pumps for the Job
For sumps, trenches and wellpoints.
FAQ
Common Questions
Dry priming or wet priming?
Dry priming (vacuum assisted) for wellpoints and long suction lines; wet priming trash pumps for sumps and pits.
Can I tow it on public roads?
Yes. Trailers are built for road towing.
Electric or diesel?
Diesel when site power is limited or temporary.
Need a Pump, Fast?
Tell us your flow, head and site conditions. We reply within 12 hours.
Phone
+86 186 0327 3463
Address
Daguben Street, Daguben Town, Fuxin, Liaoning, China.
