Construction Dewatering Pumps

Keep excavations dry and on schedule
Designed by Guzu
Tested before shipping
18-month warranty
The Challenge

Wet Sites Fall Behind

Groundwater and rain fill excavations faster than crews can dig. Wet sites stall foundations, risk wall collapse and push projects behind schedule.

How Guzu Helps

Clear Excavations, Trenches and Basements

So work stays on schedule.

01

On Site in Minutes

Trailer-mounted and road-towable.

02

Handles Mud and Debris

Open impellers that don't clog.

03

Quiet Options

Canopy sets for urban and night work.

04

Wellpoint Ready

Vacuum assisted sets for wellpoint systems.

FAQ

Common Questions

Dry priming or wet priming?

Dry priming (vacuum assisted) for wellpoints and long suction lines; wet priming trash pumps for sumps and pits.

Can I tow it on public roads?

Yes. Trailers are built for road towing.

Electric or diesel?

Diesel when site power is limited or temporary.

Need a Pump, Fast?

Tell us your flow, head and site conditions. We reply within 12 hours.

Get a Quote

Phone

+86 186 0327 3463


Address

Daguben Street, Daguben Town, Fuxin, Liaoning, China.